Matthew Kelso and colleagues during discussions before a Senate meeting in Argentina

Staff Spotlight: Matthew Kelso

As part of FracTracker’s staff spotlight series, learn more about Matthew Kelso and why he works with FracTracker Alliance to analyze data from the oil and gas industry.

Time with FracTracker: I’ve been working with FracTracker since June 2010, when it was still a part of the Center for Healthy Environments and Communities (CHEC) at the University of Pittsburgh’s Graduate School of Public Health.

Nickname: Matt

Education: Humboldt State University

Office Location: Pittsburgh, PA

Title: Manager of Data and Technology

What do you actually do in that role?

I make oil and gas data more accessible and more digestible to the general public. Largely, this is accomplished by converting spreadsheets into maps and charts to see what stories are hidden in the data. I’ve found that many people have an easier time processing impacts visually, so seeing a map with wells and violations in areas that they are familiar with will have a different effect on them than reading the same data in a huge spreadsheet that was downloaded from some regulatory agency or another.

I also work with other nonprofits to help them with their data and mapping needs.

Previous Position and Organization

As mentioned above, I worked for the University of Pittsburgh from 2010 to 2012, when FracTracker was a program at CHEC. Before that, I’ve worked as an archaeologist in the Southwest, a casino auditor, and an AmeriCorps member.

How did you first get involved working on oil and gas issues / fracking?

Environmental consciousness is something that has evolved over time for me. My family moved to Pittsburgh when I was a kid at a time when the city was busy sandblasting the soot off of iconic buildings and other landmarks all over town that had been left by over a century of steelmaking and other heavy industry. Then, I went to college in California at a time when Julia “Butterfly” Hill lived in an old-growth redwood for two years to protect it from being cut down. As an archaeologist, I spent my days looking for evidence of how people from a previous time had interacted with the environment around them. But my interest in oil and gas issues in particular really began by watching the footage of the Deepwater Horizon disaster on TV, then coming to the realization that similar – if smaller – spills and contamination events were happening all over the place.

What is one of the most impactful projects that you have been involved in with FracTracker?

To my way of thinking, the true impact of the FracTracker Alliance is varied and cumulative, much in the way that oil and gas development itself impacts people’s lives. It is useful for people to hear that a pipeline leak in Santa Barbara, an oil train explosion in Lac-Mégantic, deforestation due to sand mine development in Wisconsin, well explosions in North Dakota, ground water contamination in Pennsylvania, and pipeline operators taking land away from people using eminent domain in Texas are all phenomena related to oil and gas extraction. Even though they may be dealing with a variety of issues at the local level, the impacts of development are widespread, and one of FracTracker’s biggest impacts is reminding people of the interconnected nature of the industry.

If I were to choose just one project that I was involved in, however, I would have to say the analysis of people living within a half-mile of train tracks in Pennsylvania that we did with PennEnvironment. The project really brought into focus the damage that oil trains could incur if they happen to explode in densely populated regions throughout the state.

Brook Lenker, Matthew Kelso, and intern Gianna Calisto counting oil trains as they passed through Pittsburgh, PA

Brook Lenker, Matt Kelso, and intern Gianna Calisto counting oil trains as they passed through Pittsburgh, PA

Feature image: Matt Kelso and colleagues prior to Senate meeting in Argentina

Pipeline build out - Photo by Sierra Shamer - Oil and gas pipeline

Infrastructural Challenges: The Direction of Drilling, Pipelines, and Politics in Pennsylvania

Sierra Shamer, Visiting Scholar, FracTracker Alliance

While neighboring states New York and Maryland work to regulate the natural gas industry, Pennsylvania makes way for a pipeline build-out and continued unconventional oil and gas drilling. The industry, legislature, and state agencies claim that continued natural gas development is necessary, can be carried out safely, and will provide money, jobs, and energy to Pennsylvania. However, the price is increasingly evident, and the realization of these claims is yet to come.

PA residents are quickly learning that pipelines come with a cost; their permitting, construction, and supporting facilities infringe on private property rights, cause water and air pollution, and threaten public safety. On Friday April 29th in Westmoreland County, for example, Spectra Energy’s Texas Eastern 30″ gas pipeline exploded, severely burning one man, destroying his home, and damaging homes nearby. The local fire chief recounted his awe at the explosion. For him, it was “… like you were looking down into hell.” These costs prompt communities to consider whether the advertised benefits of pipelines will actually outweigh the costs. Active grassroots resistance has emerged throughout the state, and as it grows, it is consistently met with industry aggression and state repression.

This article provides an overview of the pipeline build-out in Pennsylvania, the political and economic environment promoting it, growing community activism, and, how the industry and state respond. An interactive map of existing and proposed pipelines in PA is featured at the end of the article.

The Shale in Pennsylvania

Pipeline build-out: Extent of the Utica (brown) and Marcellus (orange) shale formations.

Extent of the Utica (brown) and Marcellus (orange) shale formations. Click to expand.

The existing interstate pipeline network moves domestic and imported oil and gas to consumers and markets within North America. These pipelines extend from regions of conventional drilling to domestic and foreign energy markets. The recent development and expansion of unconventional drilling provides access to energy reservoirs that could not be extracted before. Within the past five years, the US overtook Russia to become the largest producer of natural gas in the world.

The Marcellus and Utica shale formations exist below the Appalachian Mountains in the northeast U.S. and into Canada. The Marcellus lies beneath Pennsylvania, Virginia, Maryland, West Virginia, Ohio, and New York. The Marcellus is now the largest region of natural gas production in the United States. Geologists estimate that 4-8,000 ft. underground, over 600 trillion cubic ft. of natural gas is accessible. The Utica formation lies underneath the Marcellus, extending north into Ontario and New York, and south into Virginia, Kentucky, and Tennessee. Geologists estimate over 38 trillion cubic ft. of natural gas is accessible – in some locations over 10,000 feet underground.

Extraction in Pennsylvania

Almost 10,000 unconventional wells in Pennsylvania produce millions of cubic feet of gas each day. This rapid extraction flooded the market, causing natural gas prices to drop dramatically. Marcellus production also outpaced the capacity of the current pipeline network. The location and flow direction of existing pipelines is not ideal for transporting Marcellus gas to markets with higher demand. Additionally, well productivity drops 70% within the first year, so new wells must be drilled to keep the gas flowing. However, the low price of gas reduced revenues, and the cost of drilling new wells remains high. Combined, these factors have paused drilling activity throughout the state. In order to overcome this, gas companies are proposing construction of new pipelines and expansions of existing ones, resulting in the current pipeline build-out.

The Economics of Pipelines

Obama discussing LNG

The dominant narrative, promoted by industry and state, weaves a story of economic prosperity gained by drilling the Marcellus, eclipsing concerns of pipeline necessity and safety. Each pipeline project claims an economic impact in dollar amounts and jobs. Williams claims that their proposed Atlantic Sunrise pipeline will “increase economic activity by $1.6 billion in project regions” and create job opportunities. Sunoco Logistics claims that the Mariner East pipeline will “add $4.2 billion to Pennsylvania’s economy, supporting more than 30,000 jobs during the construction period and … 300-400 permanent jobs.” Often, the specifics of money and jobs are not explained, and when construction begins, communities are invaded by out of state workers and left with little economic benefit.

Response to this buildout arises at all levels. Support pours down from federal and state government while resistance pushes up from the grassroots. The EPA and Obama administration work to shut down coal and promote natural gas, claiming it’s a “bridge fuel” to renewable energy. Pennsylvania’s legislature and Dept. of Environmental Protection (DEP) have battled over drilling regulations, and the push for pipelines presents a different set of challenges. While some consider the build-out necessary to maintain the natural gas industry in PA, others, such as Phil Rinaldi, envision ways in which pipelines can bring money to the state.

Philadelphia Energy Hub

Aware that interstate pipelines carry Pennsylvania shale to out-of-state markets, Phil Rinaldi, the CEO of Philadelphia Energy Solutions (PES) views the shale boom as an opportunity to maintain resource and revenue in state. In 2013 he established the Greater Philadelphia Energy Action Team (GPEAT), a group of over 80 industry, manufacturing, labor, and government stakeholders. Their objective is to capitalize on shale by promoting pipeline construction and bringing energy-intensive manufacturing to the Greater Philadelphia area. In March of this year, the GPEAT released a report titled, “A Pipeline for Growth: Fueling Economic Revitalization with Marcellus and Utica Shale Gas.” This reports details strategies to hasten the transformation of Philly into the “energy hub” of the East by inviting chemical manufacturing industries, and supporting pipeline projects to Philadelphia.

At Ground Level

2016: Columbia 26" pipeline construction near a home in Northern Maryland (Photo: Sierra Shamer)

2016: Columbia 26″ pipeline construction near a home in Northern Maryland (Photo: Sierra Shamer)

At a ground level, impacted communities, public health professionals, and environmental organizations face a ravenous industry. Unaccountable for property takings, fair compensation, and pollution, it as an industry that disregards public health and ecosystems within the shalefields. As a result, grassroots and advocacy groups organize and mobilize throughout Pennsylvania to amplify the voices of impacted residents and communities and to hold the industry and government accountable to the people.

Although pipelines bring large revenues for companies, industry, and the state, the story on the ground is different. New pipelines are either constructed on existing land easements, or new ones must be purchased from landowners along the proposed right-of-way. Pipeline operators have one goal: to find the most direct and least complicated route from supply to demand. While this lower their bottom line, new pipeline routes often disregard nearness to homes, schools, and other populated areas, and cause significant damage to farmland and ecosystems.

Frontline Communities

Pipeline companies often have the power of eminent domain, the ability to take possession of land in court if the property owner refuses a contract. Negotiating fair agreements requires landowners to hire their own appraiser and lawyer, which is not an option for everyone. Unlike drilling wells, landowners do not receive royalties for the pressurized gas flowing underneath their property, facing instead declines in property values and an inability to sell their home. As a result, landowners are left undercompensated, their land forcibly taken away in an unjust process.

Landowners along the right-of-way are the most immediately impacted, but neighbors and communities are affected as well. Each pipeline has a “potential impact radius” or “hazard zone,” the area within which an explosion causes immediate destruction. Residents within this distance experience a decrease in their property values, but currently have no legal recourse for compensation. Pipelines also require numerous compressor stations, facilities that operate 24-7 to maintain the pressure of the gas within the pipeline. Compressor stations are industrial, air polluting facilities that release greenhouse gases, neurotoxins, cancer causing agents, and other pollutants that negatively impact human health and the environment. Residents living near compressor stations experience various respiratory, sinus, and nervous system health issues. These are caused by both everyday operation and periodical gas blowdowns – facility operations when large amounts of methane and other chemicals are released directly into the air for station maintenance or emergencies.

Pipeline Regulation

FERC holds Public Meetings for the Atlantic Sunrise Pipeline (Photo: Justin Engle/The Daily Item)

FERC holds Public Meetings for the Atlantic Sunrise Pipeline (Photo: Justin Engle/The Daily Item)

In Pennsylvania, no single agency is responsible for permitting, monitoring, or regulating pipelines. The Federal Energy Regulatory Commission (FERC) permits interstate pipelines, those that cross state boundaries or carry product that does. Pipelines within the state are under the jurisdiction of the Public Utility Commission (PUC), the DEP, and/or the Dept. of Conservation and Natural Resources (DCNR).

Typically, the PUC is responsible for pipelines that provide directly to consumers. However, in 2011 Act 127 gave the PUC authority to permit and inspect gathering lines, those that move gas from well pads to larger transmission pipelines. All gathering lines have national safety standards except Class 1, those with no more than ten buildings within 220 yards. The PUC maintains a registry of the location, size, and length of gathering lines, but is only includes length for Class 1.  Over 12,000 miles of Class 1 pipelines currently exist in PA, a number expected to quadruple by 2030.

Pipeline Infrastructure Task Force

The complex regulation and unprecedented increase in proposals prompted Governor Wolf to create the Pipeline Infrastructure Task Force (PITF) in 2015. Headed by former Secretary of the DEP, John Quigley, the Task Force included regulatory agencies, industry representatives, and government officials. Their mission: to “engage stakeholders in a collaborative process to achieve a world-class pipeline infrastructure system” and to develop “policies, guidelines, and tools to assist in pipeline development.” The DEP offered live stream of meetings, provided public information, and opportunity for public input in an attempt to be transparent.

Task Force meetings eventually resulted in a final report, outlining challenges and providing suggestions for pipeline construction. First, the Task Force recommended an increase meaningful public participation and the development of long term maintenance plans to ensure safety. Second, they suggested reducing environmental impact by improving pipeline siting and construction and maximizing efficient permitting. Finally, they recommended enhancing the workforce and economic development from pipeline projects.

The Task Force openly acknowledged problems of the pipeline build-out, stating that “permits are not reviewed for the cumulative and long term impacts at a landscape level…they do not necessarily avoid sensitive lands, habitats, and natural features, nor are the impacts to natural and cultural resources, landowners, and communities…always minimized or mitigated.” Despite this, the administration and the Task Force maintain that pipelines can be built responsibly.

Community Opposition and Criticism

2016: Landowners and supporters protest the Constitution Pipeline in Northeast PA. (Photo: DC Media Group)

2016: Landowners and supporters protest the Constitution Pipeline in Northeast PA. (Photo: DC Media Group)

Challenges to the pipeline build-out exist in many forms. Landowners challenge the bullying, harassment, and eminent domain condemnations of pipeline companies. Communities criticize the acceptance of industry funding and pipelines by local representatives. Additionally, grassroots groups and environmental non-profits challenge the minimal regulation, permitting process, and lack of public participation allowed by the DEP, and the FERC “rubber stamp” permitting process.

Awareness and opposition grow with each proposal, condemnation, rupture, and explosion. This rapid construction is compromising pipeline quality and public safety, according to a report conducted by the Pipeline Safety Trust. They found that pipelines built after 2010 had higher rates of failure than those in decades past. Whistleblowers who worked for Spectra Energy have attested to the neglect of proper inspection in the haste to construct pipelines. Spectra’s Texas Eastern pipeline, completed in 1981, was built in a decade when pipelines failed at one-sixth the rate they do today. However, their preliminary investigation indicates that the explosion in Salem Township was likely the result of corrosion due to a “possible flaw in the coating material applied to the weld joints.”

The FERC is a regular target of criticism. Funded through fees received by the companies and industries it oversees, FERC rarely denies permits for pipelines. The Delaware Riverkeeper Network has filed a lawsuit against the FERC challenging the constitutionality of its decision-making.

The DEP’s dedication to protecting Pennsylvania’s environment from the natural gas industry at large is continuously questioned due to its infrastructure permitting, negligent response to water contamination complaints, and unwillingness to hold companies accountable. The DEP’s poor record on drilling regulation continues with regard to the pipeline build-out.

Pipeline Infrastructure Task Force

The Task Force is criticized for its overwhelming industry influence and lack of public inclusion. Of the 48 Infrastructure Task Force members, 56% are tied to the oil and gas industry. Specifically, 92% of the non-governmental members have industry ties. In fact, potential opposition to the build-out was intentionally absent. PA resident and documentary filmmaker Scott Cannon of the Gas Drilling Awareness Coalition (GDAC) was invited to the PITF, only to receive a letter rescinding his invitation a few days later. Additionally, concerned residents were allowed 2 minutes to make a statement, a limit strictly enforced by Secretary Quigley. While affected landowners recounted their fight for their livelihoods, the roundtable of apathetic Task Force members stared blankly. These problems resulted in escalating activist presence increasing from comments and protests outside the DEP building, to meeting disruptions and arrests.

Residents and activists weren’t the only ones unhappy with the PIFT. Cindy Ivey, representative for Williams, and Sarah Battisti, with SouthWest Energy, spoke of their frustrations. The fact that interstate pipeline projects are regulated by federal agencies, and state level organizations have a minor role caused tension in the group. According to Ivey, these issues are “hard things to try to explain gracefully.” Additionally, Battisti added that the 184 recommendations in the report wouldn’t “impact any of us in the near future.”

Despite recommendations of the Task Force, the DEP continues to issue permits that neglect cumulative impacts and complete environmental review. Unlike New York, which denied the 401 Water Quality certificate and prevented the construction of Constitution pipeline, the PA DEP granted the 401 certificate to the Atlantic Sunrise pipeline. As a result, it is under appeal by environmental groups, who argue that it violates the Clean Water Act and the Pennsylvania Code.

PA’s Political Climate

Fracking and the Revolving Door in Pennsylvania Regulations

Unfortunately, meaningful updates to oil and gas regulations in Pennsylvania are consistently challenged. Although Act 13 passed in 2012, critical components were appealed repeatedly, specifically the issue of local zoning authority of oil and gas infrastructure. Lawmakers who oppose any restriction on the industry dominate the current legislature. Recently, the House panel voted a second time to block increased DEP oil and gas regulations, in the making since 2011.

Frustrations in the process peaked when John Quigley resigned as secretary of the DEP after sending a profane email chastising environmental groups for their lack of support. Weeks later, Governor Wolf signed a bill that eliminates current regulations, aiming to start new and in agreement with the legislature. As a result, many environmentalists feel that the Governor has consistently compromised on the environment, putting the lives of PA residents at risk.

Political Campaigns

The relationship between the state and the drilling industry is evident and problematic in Pennsylvania. The Marcellus Money project has tracked campaign contributions and lobbying expenses from the natural gas industry, revealing over $8 million in political contributions and $46 million for lobbying efforts. In 2013 the Public Accountability Initiative released a report revealing the “revolving door” between state government and the oil and gas industry. The report identifies individuals who have moved from the public sector to industry jobs or vice versa, and how often this occurs over the course of their careers.

NPR StateImpact Pennsylvania created an interactive webpage called, “Blurred Lines” that provides a visual exploration of the “revolving door.” As you scroll through the years, individuals slide back and forth between the private and public sector. Additionally, lawmakers have, for a third time, earmarked fiscal code legislation to fund an industry-supported non-profit Shale Alliance for Energy Research PA, (SAFER PA).

State Agencies

Financial gains from drilling support other aspect of the public sector as well. The DCNR’s annual budget became increasingly reliant upon revenues from gas leases within public lands. In 2013, oil and gas lease royalties and other payments provided one-third of the DCNR’s budget. Act 13 implemented a mandatory impact fee whereby the PUC collects money from companies based on the number of oil and gas wells in the state. This money is directed to local municipalities based on the number of wells within their boundaries. However, while 60% of the fee total goes directly to impacted counties, the remaining 40% can go anywhere in PA. While impact fees totaled over $233 billion dollars in 2014, 2016 is expected to be the lowest amount yet due to the decline in drilling activity. This statistic is one of many that highlights the risk of relying on a fluctuating resource.

Governmental and Industry Responses

US_Marshal_Holleran

2016: Armed U.S. Marshall escort the tree cutting crew for the Constitution pipeline on Megan Holleran’s property (Photo: Alex Lotorto)

Response to community opposition of pipeline projects is often militaristic in nature and exaggerated by the industry and the state. The oil and gas industry views community opposition to infrastructure as an “insurgency.” In 2011, it was revealed that the Army/Marine Corps Counterinsurgency manual is used as a tactical reference. The Gas Drilling Awareness Coalition was classified as a terrorist threat by the PA Office of Homeland security, who hired the Institute of Terrorism Research and Response to track activists provide weekly information on a bulletin sent to law enforcement and gas companies. In 2012, state law enforcement, the FBI, the PA Office of Homeland Security, and the oil and gas industry established the Marcellus Shale Operators’ Crime Committee (MSOCC). This committee actively targeted activists and environmentalists in their homes.

Landowners who refuse to sign easements face an uphill battle against companies, law enforcement, and the state as they advocate for their rights. Megan Holleran of Susquehanna County lost her family’s maple syrup trees to Williams’ proposed Constitution pipeline. After protesting and challenging in court, the judge upheld eminent domain and prohibited the family from being within 150 feet from the right-of-way. Further, armed U.S. Marshalls escorted and guarded the tree cutting crew against peaceful protest. Additionally, in Huntingdon County, Elise and Ellen Gerhart faced tree clearing of their woods for Sunoco’s Mariner East pipeline. Once again, armed police escorted tree cutting crews and made several arrests of protesters, who faced bails of up to $200,000.

Pipeline Build-Out Map

The map below shows the existing major pipeline infrastructure in Pennsylvania and proposed pipelines, with the option of also viewing the unconventional wells in the Marcellus and Utica shale. For more information on pipeline regulation and public information, please view our Intro to Pipelines resource page. It includes details about current and proposed pipeline projects in Pennsylvania and throughout the country. Additionally, the intro links to a map of all proposed pipeline projects in North America.


View map full screen | How FracTracker maps work

While it is clear that companies go to every length to construct pipelines, it is equally clear that state agencies, courts, and law enforcement support pipeline development. The direction of drilling, pipelines, and politics in the state of Pennsylvania serves the bottom line of the natural gas industry. This is evidenced by the proposed pipeline built-out, state support, and state suppression of public backlash. However, continued challenges to public health and environment will only serve to increase the resilience and strength of community opposition.

Approaching 10K Unconventional Wells in PA

Approaching 10K Unconventional Wells in PA

By Matt Kelso, Manager of Data & Technology

Each state has its own definition of what it means for an oil or gas well to be “fracked.” In Pennsylvania, these wells are known as “unconventional,” a definition mostly based on the depth of the target formation:

An unconventional gas well is a well that is drilled into an unconventional formation, which is defined as a geologic shale formation below the base of the Elk Sandstone or its geologic equivalent where natural gas generally cannot be produced except by horizontal or vertical well bores stimulated by hydraulic fracturing.

The count of these unconventional wells in PA stands at 9,760 as of June 14, 2016. Their distribution is widespread across the state, but is particularly focused in the northeast and southwest corners of Pennsylvania.

Unconventional oil and gas wells in Pennsylvania:

View map full screen | How FracTracker maps work

Wells Drilled

The industry is not drilling at the same torrid pace as it was between 2010 and 2012, however. The busiest month for drill rigs in the Keystone State was August 2011, with 210 unconventional wells drilled. Last month, there were just 32 such wells.

Unconventional wells in PA: Unconventional oil and gas permits, wells, and violations in Pennsylvania by quarter. Data source: Pennsylvania DEP

Figure 1. Unconventional oil and gas permits, wells, and violations in Pennsylvania by quarter. Data source: Pennsylvania DEP

Permits

As Figure 1 captures, the number of permits issued per quarter is always greater than the number of wells drilled during the same time period. Even when drilling activity seems to be entering a bust phase, oil and gas operators continue to plan for future development. Altogether, there are 17,492 permitted locations, meaning there are about 7,700 permitted locations where drilling has not yet commenced.

Violations

The number of violations issued by DEP is generally follows the same trends as permits and wells. It is usually the smallest of the three numbers. In the first quarter of 2016, however, is one of a few instances on the chart above where the number of violations issued outpaced wells drilled. There could be any number of reasons for this anomaly; it could have been due to to unusual compliance issued in the field or aggressive regulatory blitzes. It could also be due to some other factor that can’t be determined by the available published data source.

Interestingly, this phenomenon has not occurred since the first quarter of 2010, when the industry was in full swing.

About VpW

One of the best ways to understand the impact of the industry is to look at violations per well (VpW). Unfortunately, there are a number of important caveats to that discussion. First of all, not all items that appear on the compliance report receive their own Violation ID number. It is clear from the DEP workload report that violations are tallied internally by the number of Violation ID numbers. This is as opposed to the number of items on the compliance report. As of June 14, 2016, there were 6,706 rows of data and 5,755 distinct Violation ID numbers that were issued to 2,080 different oil and gas wells. This discrepancy means that about 21% of unconventional wells are issued violations in Pennsylvania. Those that are cited receive an average of 2.8 to 3.2 violations per well, depending on how you count them.

Unconventional Wells in PA: Violations per well (VpW) of the 20 companies with the most unconventional wells in PA.

Table 1. Violations per well (VpW) of the 20 companies with the most unconventional wells in PA.

Determining the violations per well by operator comes with additional caveats. The drilled wells data comes from the spud report, which lists the current operator of each of the wells. The compliance report, however, lists the operator that was in charge of the well at the time of the infraction. This poses a problem for analysis, however. The ownership of the wells is quite fluid when taken in aggregate, as companies fold, are bought out, or change their names to something else.

VpW Results

We calculated VpW figures for the 20 operators with the largest inventory of drilled wells wells in Pennsylvania, found in Table 1. In some instances, we were able to reunite operators with violations that were issued under a different name but are in fact the same company. Specifically, we combined Rex Energy’s violations with RE Gas Dev, CONSOL violations with CNX, and Southwestern with SWN Productions, as the company is now known.

SWN’s violation-per-well score appears to be quite low. Their statistic, however, does not take into account wells that it purchased from Chesapeake in 2014, for example. In this transaction, 435 wells changed hands, with an unknown number of those in Pennsylvania. Any violations on these wells that Chesapeake had would stay with that company even as their well count was reduced. Such a change would thereby artificially inflate Chesapeake’s VpW score. On the other hand, SWN is now in possession of a number of wells which might have been problematic during the early stages of operation. Those violations, alternatively, are not associated with SWN, making their inventory of wells appear to be less problematic.

Data Caveats and Takeaways

Alas, we do not live in a world of perfect data. As such, these results must be taken with a grain of salt. Still, we can see that there are some trends that persist among operators that have been active in Pennsylvania for many years. Chief, Cabon, and EXCO, for example, all average more than one violation per well drilled. Chevron, CNX, and RE Gas Development, on the other hand, have much better rates of compliance, on the order of one violation per every five wells drilled.

Drilling Bella Romero: Children at Risk in Greeley, Colorado

By
Kirk Jalbert, Manager of Community Based Research & Engagement
Kyle Ferrar, Western Program Coordinator

Weld County, Colorado, is one of the top producing shale oil and gas regions in the United States, boasting more than 12,000 active horizontal or directional wells, which account for 50% of all horizontal or directional wells in the state. To put this into perspective, the entire state of Pennsylvania has ten times the land area with “only” 9,663 horizontal or directional wells. At the center of Weld County is the city of Greeley, population 92,889. Greeley has experienced dramatic changes in the past decade as extraction companies compete to acquire oil and gas mineral rights. Extensive housing developments on the outskirts of the city are being built to accommodate future well pads on neighboring lots. Meanwhile, a number of massive well pads are proposed within or on the border of city limits.

FracTracker visited Colorado back in November 2015 and met with regional advocacy organizations including Coloradans Against Fracking, Protect our Loveland, Weld Air and Water, and Our Longmont to determine how we could assist with data analysis, mapping, and digital storytelling. FracTracker returned in June 2016 to explore conditions unique to Weld County’s oil and gas fields. During our visit we interviewed residents of Greeley and found that one of their greatest concerns was the dangers of siting oil and gas wells near schools. While there is much more we will be publishing in coming weeks about our visit, this article focuses on one troubling project that would bring gas drilling to within 1,300ft of a public school. The proposal goes before the Weld County Commissioners on Wednesday, June 29th for final approval. As such, we will be brief in pointing out what is at stake in siting industrial oil and gas facilities near schools in Colorado and why residents of Greeley have cause for concern.

Drilling Bella Romero

On June 7th, the Weld County Planning Commission unanimously approved a proposal from Denver-based Extraction Oil & Gas to develop “Vetting 15H”—a 24-head directional well pad in close proximity to Bella Romero Academy, a middle school just outside Greeley city limits. In addition to the 24-head well pad would be a battery of wastewater tanks, separators, and vapor recovery units on an adjacent lot. The permit submitted to the Colorado Oil & Gas Conservation Commission (COGCC) also states that six more wells may be drilled on the site in the future.

As was detailed in a recent FracTracker article, Colorado regulations require a minimum setback distance of 500ft from buildings and an additional 350ft from outdoor recreational areas. In more populated areas, or where a well pad would be within 1,000ft of high occupancy buildings, schools, and hospitals, drilling companies must apply for special variances to minimize community impacts. Setbacks are measured from the well head to the nearest wall of the building. For well pads with multiple heads, each well must comply with the respective setback requirements.

bella_romero_playground

Bella Romero’s playground with Vetting 15H’s proposed site just beyond the fence.

Vetting 15H would prove to be one of the larger well pads in the county. And while its well heads remain just beyond the 1,000ft setback requirement from Bella Romero buildings, a significant portion of the school’s ballfields are within 1,000ft of the proposed site. When setbacks for the well pad and the processing facility are taken together—something not explicitly demonstrated in the permit—almost the entirety of school grounds are within 1,000ft and the school itself lies only 1,300ft from the pad. The below figures show the images supplied by Extraction Oil & Gas in their permit as well as a more detailed graphic generated by FracTracker.

 

Youth: A High Risk Population

The difference between 1,000ft and 1,300ft may be negligible when considering the risks of locating industrial scale oil and gas facilities near populated areas. The COGCC has issued 1,262 regulatory violations to drilling companies since 2010 (Extraction Oil & Gas ranks 51st of 305 operators in the state for number of violations). Some of these violations are for minor infractions such as failing to file proper paperwork. Others are for major incidents; these issues most often occur during the construction phases of drilling, where a number have resulted in explosions and emergency evacuations. Toxic releases of air and water pollution are not uncommon at these sites. In fact, the permit shows drainage and potential spills from the site would flow directly towards Bella Romero school grounds as is shown in the figure below.

Vetting 15H post-development drainage map.

Vetting 15H post-development drainage map.

A host of recent research suggests that people in close proximity to oil and gas wells experience disproportionate health impacts. Emissions from diesel engine exhaust contribute to excessive levels of particular matter, and fumes from separators generate high levels of volatile organic compounds. These pollutants decrease lung capacity and increase the likelihood of asthma attacks, cardiovascular disease, and cancer (read more on that issue here). Exposure to oil and gas facilities is also linked to skin rashes and nose bleeds.

As we’ve mentioned in our analysis of oil and gas drilling near schools in California, children are more vulnerable to these pollutants. The same amount of contaminants entering a child’s body, as opposed to an adult body, can be far more toxic due to differences in body size and respiratory rates. A child’s developing endocrine system and neural pathways are also more susceptible to chemical interactions. These risks are increased by children’s lifestyles, as they tend to spend more hours playing outdoors than adults and, when at school, the rest of their day is spent at a central location.

At the June 7th public hearing Extraction Oil & Gas noted that they intend to use pipelines instead of trucks to transport water and gas to and from Vetting 15H to reduce possible exposures. But, as residents of Greeley noted of other projects where similar promises were made and later rescinded, this is dependent on additional approvals for pipelines. Extraction Oil & Gas also said they would use electric drilling techniques rather than diesel engines, but this would not eliminate the need for an estimated 22,000 trucking runs over 520 days of construction.

Below is a table from the Vetting 15H permit that shows daily anticipated truck traffic associated with each phase of drilling. The estimated duration and operational hours of each activity are based on only 12 wells since construction is planned in two phases of 12 wells at a time. These numbers do not account for the trucking of water for completions activities, however. The figures could be much higher if pipelines are not approved, as well as if long-term trucking activities needed to maintain the site are included in the estimates.

Vetting 15H daily vehicle estimates.

Vetting 15H daily vehicle estimates from permit

 

At the Top of the Most Vulnerable List

Bella Romero Academy has the unfortunate distinction of being one of the few schools in Colorado in close proximity to a horizontal or directional well amongst 1,750 public and 90 private schools in the state. Based on our analysis, there are six public schools within 1,000ft of a horizontal or directional well. At 2,500ft we found 39 public schools and five private schools. Bella Romero is presently at the top of the list of all schools when ranked by number of well heads located within a 1,000ft buffer. An 8-head well pad is only 800ft across the street from its front door. If the Vetting 15H 24-head well pad was to be constructed, Bella Romero would be far and above the most vulnerable school within 1,000ft of a well. It would also rank 3rd in the state for well heads located within 2,500ft of a school. The tables below summarize our findings of this proximity analysis.

Colorado public schools within 1,000ft of a horizontal or directional well

Colorado public schools within 1,000ft of a horizontal or directional well

Colorado public schools within 2,500ft of a horizontal or directional well with 5 or more well heads. There are 39 schools in total.

Colorado public schools within 2,500ft of a horizontal or directional well with 5 or more well heads. There are 39 schools in total

Colorado private schools within 2,500ft of a horizontal or directional well

Colorado private schools within 2,500ft of a horizontal or directional well

The following interactive map shows which schools in Colorado are within a range of 2,500ft from a directional and horizontal well. Additional buffer rings show 1,000ft and 500ft buffers for comparison. 1,000ft was selected as this is the minimum distance required by Colorado regulations from densely populated areas and schools without requiring special variances. Environmental advocacy groups are presently working to change this number to 2,500ft. The map is zoomed in to show the area around Bella Romero. Zoom out see additional schools and click on features to see more details. [NOTE: The Colorado school dataset lists Bella Romero Academy as an elementary/middle school. Bella Romero was recently split, with the elementary school moving a few blocks west.]

Map of schools and setbacks in Colorado

View map full screen | How FracTracker maps work

Environmental Injustice

Drilling near Bella Romero is also arguably an environmental justice issue, as its student population has some of the highest minority rates in the county and are amongst the poorest. According to coloradoschoolgrades.com, Bella Romero is 89% Hispanic or Latino and 3% African American whereas, according to the U.S. Census Bureau, Greeley as a whole is 59% White and 36% Hispanic or Latino. 92% of Bella Romero’s students are also from low income families. Furthermore, according to the EPA’s Environmental Justice Screening Tool, which is used by the agency to assess high risk populations and environments, the community surrounding Bella Romero is within the 90-95% percentile range nationally for linguistically isolated communities.

Many of Bella Romero's students come from low-income communities surrounding Greeley.

Many of Bella Romero’s students come from low-income communities surrounding Greeley.

 

Implications

These statistics are significant for a number of reasons. Firstly, oil and gas permitting in Colorado only requires operators to notify residents immediately surrounding proposed well pads. This rule does not include residents who may live further from the site but send their students to schools like Bella Romero. Parents who might comment on the project would need to hear about it from local papers or neighbors, but language barriers can prevent this from occurring. Another factor we witnessed in our June visit to Latino communities in Weld County is that many students have undocumented family members who are hesitant to speak out in public, leaving them with no voice to question risks to their children.

Residents of Greeley speak out at the June 7th Planning Commission meeting.

Residents of Greeley speak out at the June 7th Planning Commission meeting

Nevertheless, at the June 7th Planning Commission hearing, Weld County administrators insisted that their decisions would not take race and poverty into consideration, which is a blatant disregard for EPA guidelines in siting industrial development in poor minority communities. Weld County’s Planning Commission claimed that their ruling on the site would be the same regardless of the school’s demographics. By comparison, another proposed Extraction Oil & Gas site that would have brought a 22-head well pad to within 1,000ft of homes in a more well off part of town was denied on a 0-6 vote by the City of Greeley’s Planning Commission earlier this year after nearby residents voiced concerns about the potential impacts. Extraction Oil & Gas appealed the ruling and Greeley City Council passed the proposal in a 5-2 vote pending additional urban mitigation area permit approval. While the Greeley Planning Commission and the Weld County Planning Commission are distinct entities, the contrast of these two decisions should emphasize concerns about fair treatment.

Conclusion

There are very real health concerns associated with siting oil and gas wells near schools.  When evaluating this project, county administrators should assess not only the immediate impacts of constructing the well pad but also the long-term effects of allowing an industrial facility to operate so close to a sensitive youth population. There are obvious environmental justice issues at stake, as well. Public institutions have a responsibility to protect marginalized communities such as those who send their children to Bella Romero. Finally, approving the Vetting 15H project would place Bella Romero far at the top of the list for schools in Colorado within 1,000ft of oil and gas wells. School board administrators should be concerned about this activity, as it will undoubtedly put their students’ health and academic performance at risk. We hope that, when the County Commissions review the proposal, these concerns will be taken into account.

26" oil/gas pipeline being installed in Maryland, 2016

An Introduction to Oil and Gas Pipelines

By: Wendy Fan, FracTracker Alliance Intern

North America consists of a vast network of inter- and intrastate pipelines that serve a vital role in transporting water, hazardous liquids, and raw materials. There is an estimated 2.6 million miles of pipelines in the nation, and it delivers trillions of cubic feet of natural gas and hundreds of billions of tons of liquid petroleum products each year. Because the pipeline network fuels the nation’s daily functions and livelihoods by delivering resources used for energy purposes, it is crucial to shed light on this transportation system. This article briefly discusses oil and gas pipelines, what they are, why they exist, their potential health and environmental impacts, proposed projects, and who oversees them.

What are pipelines, and what are they used for?

Oil and Gas Pipelines in ND

Pipelines in North Dakota. Photo credit: Kathryn Hilton

The pipeline network in the U.S. is a transportation system used to move goods and materials. Pipelines transport a variety of products such as sewage and water. However, the most common products transported are for energy purposes, which include natural gas, biofuels, and liquid petroleum. Pipelines exist throughout the country, and they vary by the goods transported, the size of the pipes, and the material used to make pipes.

While some pipelines are built above ground, the majority of pipelines in the U.S. are buried underground. Because oil and gas pipelines are well concealed from the public, most individuals are unaware of the existence of the vast network of pipelines.

Extent of U.S. Pipeline System

The United States has the most miles of pipelines than any other country, with 1,984,321 km (1,232,999 miles) in natural gas transport and 240,711 km (149,570 miles) in petroleum products. The country with the second most miles of pipelines is Russia with 163,872 km (101,825 miles), and then Canada with 100,000 km (62,137 miles).

Types of Oil and Gas Pipelines

There are two main categories of pipelines used to transport energy products: petroleum pipelines and natural gas pipelines.

  1. Petroleum pipelines transport crude oil or natural gas liquids, and there are three main types of petroleum pipelines involved in this process: gathering systems, crude oil pipeline systems, and refined products pipelines systems. The gathering pipeline systems gather the crude oil or natural gas liquid from the production wells. It is then transported with the crude oil pipeline system to a refinery. Once the petroleum is refined into products such as gasoline or kerosene, it is transported via the refined products pipeline systems to storage or distribution stations.
  2. Natural gas pipelines transport natural gas from stationary facilities such as gas wells or import/export facilities, and deliver to a variety of locations, such as homes or directly to other export facilities. This process also involves three different types of pipelines: gathering systems, transmission systems, and distribution systems. Similar to the petroleum gathering systems, the natural gas gathering pipeline system gathers the raw material from production wells. It is then transported with large lines of transmission pipelines that move natural gas from facilities to ports, refiners, and cities across the country. Lastly, the distribution systems consist of a network that distributes the product to homes and businesses. The two types of distribution systems are the main distribution line, which are larger lines that move products close to cities, and the service distribution lines, which are smaller lines that connect main lines into homes and businesses.

Right-of-Way (ROW)

Before pursuing plans to build new pipelines, a ROW needs to be secured from private and public landowners, which pipeline companies usually will pay for. ROW are easements that must be agreed and signed upon by both the landowner and pipeline company, and permits pipeline operators to go forth with installing and maintaining pipelines on that land. Pipeline operators can obtain ROW by purchasing the property or through a court-ordered procedure. ROW can be permanent or temporary acquisitions, and needs approval from FERC.

Regulatory Oversight

Depending on the type of pipeline, what it is transferring, what it is made of, and where it runs, there are various federal or state agencies that have jurisdiction over its regulatory affairs.

A. Federal Energy Regulatory Commission (FERC)

Interstate pipelines, those that either physically cross state boundaries or carry product that will cross state boundaries, are all permitted by the Federal Energy Regulatory Commission (FERC). The FERC is an independent organization within the U.S. Department of Energy that permits interstate electricity and natural gas infrastructure. The FERC’s authority lies within various acts of energy legislation, beginning with the Natural Gas Act of 1938 to the more recent Energy Policy Act of 2005. The U.S. President appoints its four commissioners. Other agencies such as the Dept. of Transportation, regional authorities such as the River Basin Commissions, and the Army Corps of Engineers may also be involved. FERC approves the location, construction, operation, and abandonment of interstate pipelines. They do not have jurisdiction over the siting of intrastate natural gas pipelines nor hazardous liquids.

B. Pipeline and Hazardous Materials Administration (PHMSA)

Under the U.S. Department of Transportation, the PHMSA oversees, develops, and enforces regulations to ensure the safe and environmentally sound pipeline transportation system. There are two offices within the PHMSA that fulfill these goals. The Office of Hazardous Materials Safety develops regulations and standards for classifying, handling, and packaging hazardous materials. The Office of Pipeline Safety develops regulations and risk management approaches to assure safe pipeline transportation, and ensures safety in the design, construction, operation and maintenance, and spill response of hazardous liquid and natural gas pipeline transportation. Below are some regulations enforced by PHMSA:

1. Pipeline Safety, Regulatory Certainty, and Job Creation Act of 2011 or Pipeline Safety Act 2011

This act reauthorizes PHMSA to continue with the examination and improvement of the pipeline safety regulations. It allows PHMSA to:

  • Provide the regulatory certainty necessary for pipeline owners and operators to plan infrastructure investments and create jobs
  • Improve pipeline transportation by strengthening enforcement of current laws and improving existing laws where necessary
  • Ensure a balanced regulatory approach to improving safety that applies cost-benefit principles
  • Protect and preserve Congressional authority by ensuring certain key rule-makings are not finalized until Congress has an opportunity to act

2. Federal Pipeline Safety Regulations: Public Awareness Programs

  • Enforced by PHMSA, the Public Awareness Program mandates that pipeline companies and operators to develop and implement public awareness programs that follow guidance provided by the American Petroleum Institute.
  • Under this regulation, pipeline operators must provide the public with information on how to recognize, respond, and report to pipeline emergencies.

3. Natural Gas Pipeline Safety Act of 1968

  • This act authorizes the Department of Transportation to regulate pipeline transportation of flammable, toxic, or corrosive natural gas, or other gases, as well as transportation and storage of liquefied natural gas.

The PHMSA also designed an interactive national pipeline mapping system for the public to access and utilize. However, the map can only be viewed one county at a time, it does not include distribution or gathering lines, and when you zoom in too far, the pipelines disappear. In fact, the site warns that the map should not be used to determine accurate locations of pipelines, stating that the locations can be incorrect by up to 500 ft. PHMSA argues that these restrictions exist in the interest of national security.

C. United States Army Corps of Engineers

Permits must be obtained from the U.S. Army Corps of Engineers if a pipeline is to be constructed through navigable bodies of water, including wetlands. State environmental regulatory agencies, such as PA’s Department of Environmental Protection, are also involved in the approval process of pipeline construction through waterways and wetlands.

Environmental Health and Safety Risks

Although pipeline transportation of natural gas and petroleum is considered safer and cheaper than ground transportation, pipeline failures, failing infrastructure, human error, and natural disasters can result in major pipeline disasters. As such, previous incidents have been shown to cause detrimental effects to the environment and the public’s safety.

A. Land Use and Forest Fragmentation

Columbia Pipeline

Construction staging area and the right-of-way of Columbia’s 26″ Pipeline. Photo credit: Sierra Shamer

In order to bury pipelines underground, an extensive amount of forest and land is cleared out to meet the pipe’s size capacity. States, such as Pennsylvania, that consist of rich ecosystem due to their abundance of forests, are at critical risk of diminishing habitats for plant species, and are at risk of the eradication of certain animal species. The U.S. Geological Survey (USGS) aimed to quantify the amount of land disturbance in Bradford and Washington counties in PA as a result of oil and gas activity including pipeline implementation. The USGS report concluded that pipeline construction was one of the highest sources of increasing forest patch numbers. Bradford County, PA had an increase of 306 patches, in which 235 were attributable to pipeline construction. Washington County increased by 1,000 patches, in which half was attributable to pipeline construction.

B. Compressor Stations

Compressor stations play an important role in processing and transporting the materials that pass through the pipeline. However, compressor stations present significant environmental health hazards. Even when the process of drilling and fracking is completed, compressor stations remain in the area to keep the gas in pipelines continually flowing. The stationary nature of this air pollution source means that a combination of pollutants such as volatile organic compounds (VOCs), nitrogen oxides (NOx), formaldehyde, and greenhouse gases are continually being released into the atmosphere. These pollutants are known to produce deleterious health impacts to the respiratory system, nervous system, or lung damage. In addition to pollutants emitted, the noise level generated by compressor stations can reach up to 100 decibels. The Center of Disease Control and Prevention (CDC) reports hearing loss can occur by listening to sounds at or above 85 decibels over an extended period of time.

C. Erosion and Sedimentation

Heavy rainfall or storms can lead to excessive soil disruption, in turn increasing opportunities for erosion and sedimentation to occur. Erosion can uncover pipelines buried underground, and rainfall of more than 5 inches (13 cm) can move or erode berms, and also disrupt mounds of soil used to protect against flooding. Soil erosion increases underground pipelines’ vulnerability to damage from scouring or washouts, and damage from debris, vehicles, or boats.

D. Eminent Domain

Eminent domain allows state or federal government bodies to exercise their power to take private property from residents or citizens for public use and development. In some cases, private companies have exercised power to seize land for their own profit. Owners of the property are then given a compensation in exchange for their land. However, landowners may end up spending more than they receive. In order to receive compensation, owners must hire their own appraiser and lawyer, and they are also not usually compensated for the full value of the land. Furthermore, property values decrease once pipelines are established on their land, making it more difficult to sell their home in the future.

E. Spills and Leaks

Poorly maintained and faulty pipelines that transport liquefied natural gas or crude oil may pose high health and environmental risks should the fluids spill or leak into the soil. Crude oil can contain more than 1,000 chemicals that are known carcinogen to humans, such as benzene. The release of the potentially toxic chemical or oil can infiltrate into the soil, exposing communities to fumes in the atmosphere as well as contaminating groundwater and surface water. Not only are the incidents costly to control and clean up, the chemical or oil spills can also have long lasting impacts to the environment and the public. A ruptured pipeline that leaked 33,000 gallons of crude oil in Salt Lake City, Utah in 2010 exposed residents in a nearby community to chemical fumes, causing them to experience drowsiness and lethargy. After being commissioned in 2010, the TransCanada Keystone Pipeline had reported 35 leaks and spills in its first year alone. In April 2016, the Keystone pipeline leaked 17,000 gallons of oil in South Dakota. Older pipelines are more likely to leak than newer ones, so this issue will only increase as pipeline infrastructure ages.

Natural gas pipelines have also been shown to leak methane, a major component in natural gas, at levels that far exceed what is estimated. Not only does methane contribute to climate change, it puts surrounding communities at risk of gas explosions, and exposes them to dangerously high levels of methane in the air they breathe.

F. Explosions

Pipeline sign Texas 2016

Pipeline warning sign in Texas. Photo credit: Ecologic Institute US

Explosions are also common with faulty pipelines that leak natural gas. Unlike oil or liquid spills, which generally spread and infiltrate into the soil, gas leaks can explode due to the hydrocarbon’s volatility. A recent pipeline explosion in Westmoreland County, PA, for example, caused a man to incur severe burns, as well as caused dozens of homes to be evacuated. Another pipeline explosion in San Bruno, California resulted in 8 people dead, 6 missing, and 58 injured. Thirty-eight homes were also destroyed and 70 others were damaged. This explosion exposed the haphazard system of record keeping for the tens of thousands of miles of gas pipelines, shoddy construction, and inspection practices.

Upcoming Proposed Projects

An estimated 4,600 miles of new interstate pipelines will be completed by 2018. Below are just a few major projects that are currently being proposed or are in the process of obtaining a permit.

A. Atlantic Sunrise Expansion Project

This pipeline will include 194 miles throughout the state of Pennsylvania. It will be constructed to cut through portions of 10 different PA counties, including Columbia, Lancaster, Lebanon, Luzerne, Northumberland, Schuylkill, Susquehanna, Wyoming, Clinton, and Lycoming. This project will require a 125-foot ROW, and will traverse through 52 areas designed as “protected land” in Pennsylvania. This proposed project is still in review by FERC – a decision is expected late 2016 or early 2017.

B. NEXUS Gas Transmission

Spectra Energy (Houston), DTE Energy (Detroit), and Enbridge Inc. (Canada) are partnering to build a $2 billion gas line that would travel from eastern Ohio to Michigan to Ontario. Already applied with FERC and will start construction early 2017. It proposed a 255-mile pipeline and will be 36-inch wide line.

C. Mariner East 2 Pipeline

This pipeline will expand the existing pipeline’s capacity from 70,000 barrels a day to 345,000. It has plans to deliver propane, butane, ethane, and other natural gas liquids across state to Delaware, Berks, and Lebanon counties in PA. Currently, the construction is delayed due to push back and permits acquisition.

D. Northeast Energy Direct (NED) Project

This project was intended to expand an existing pipeline by 420 miles from Susquehanna County, Pennsylvania and passing through New York, Massachusetts, New Hampshire, and Connecticut. Recently in April 2016, Kinder Morgan decided to suspend further development of this proposed pipeline.

E. Atlantic Coast Pipeline

The Atlantic Coast Pipeline had initial plans to establish 550 miles of pipeline from West Virginia to North Carolina, and to cut through dozens of Chesapeake headwater streams, two national forests, and across Appalachian Trail. Their permit to construct this pipeline was denied by the US Forest Service on January 2016; thus, delaying the project at the moment.

F. Algonquin Incremental Market (AIM) Project

With approval by FERC, Spectra Energy has begun 37 miles of pipeline construction through New York, Connecticut, and Massachusetts. The pipeline location is particularly worrisome because it is critically close to the Indian Point nuclear power plant. Ruptures or leaks from the pipeline can threaten the public’s safety, and even result in a power plant meltdown. Spectra Energy has also submitted two additional proposals: the Atlantic Bridge and Access Northeast. Both projects will expand the Algonquin pipeline to reach New England, and both are still in the approval process with FERC.

G. Constitution Pipeline

The Constitution pipeline had initially planned to include 124 miles from Susquehanna County, Pennsylvania to Schoharie County, New York, and was denied by NY State in April 2016.

To view the routes of proposed pipelines, visit FracTracker’s North American Pipeline and Oil and Gas Infrastructure Proposals map.

North America Proposed Oil and Gas Pipelines Map

Preview of North America proposed pipelines map. Click to view fullscreen.

Further Questions

Please email us at info@fractracker.org if there are any unanswered questions you would like us to answer or include.

Update: this article was edited on June 21, 2016 due to reader feedback and suggestions. 

Defining Environmental Justice in Pennsylvania

By Kirk Jalbert, Manager of Community-Based
Research & Engagement, FracTracker Alliance

Missing the Mark in Oil & Gas Communities

Conventional oil and gas drilling for commercial purposes has existed in Pennsylvania for over 150 years. In the past decade, drilling operations have turned to extract these resources from unconventional reservoirs, such as the deep underground Marcellus Shale formation. Proponents of the oil and gas industry’s expansion promise jobs and tax revenue for regions seeking economic revitalization. However, a growing body of research suggests that these processes also negatively impact the environment and pose significant public health risks.

According to the U.S. Environmental Protection Agency, environmental justice is the fair treatment and meaningful involvement of all people regardless of race, color, national origin, or income with respect to the development, implementation, and enforcement of environmental laws, regulations, and policies. How this definition applies to residents of Pennsylvania has become a hotly contested issue as regulatory agencies have begun to investigate whether or not the oil and gas industry targets marginalized communities.

PA Environmental Justice Map

The following interactive article and map illustrates how race and poverty, the two key indicators for determining environmental justice eligibility, fail to capture the nature of the industry. It also suggests that there are other ways we might assess unfair development practices. In doing so, the goal of the article is to shed light on the complexity of environmental justice issues and to offer guidance as PA’s Department of Environmental Protection (DEP) assesses its policies in coming days.

environmental justice map

Feature image photo credit: Drilling rig and farm in PA by Schmerling (photodocmark@gmail.com)