Staff Spotlight: Ted Auch

As part of FracTracker’s staff spotlight series, learn more about Ted Auch, PhD and why he started researching the impacts of oil and gas development.

Ted Auch during a trip to NW Michigan's Ludington State Park to photograph and learn more about Sargent Sand's mine

Ted Auch during a trip to NW Michigan’s Ludington State Park to photograph and learn more about Sargent Sand’s mine

Time with FracTracker: 3 ½ years

College: University of Vermont BS and PhD, Virginia Tech

Office Location: Cleveland Heights, OH

Title: Great Lakes Program Coordinator

What do you actually do in that role?

My interests include topics such as environmental justice, ecosystem services, watershed resilience, and landscape alteration(s). My work here at FracTracker focuses on the Food, Energy, and Water (FEW) nexus as it relates to hydraulic fracturing and related oil & gas activities/infrastructure with a focus on waste, watershed resilience and freshwater demand, and land-use change.

Previous Position and Organization

2011-2012 Vacant Land Repurposing (VLR) Postdoc, Cleveland Botanical Garden

2012- Present Adjunct Faculty, Cleveland State University, Teaching Intro Environmental Science and Geology, Soil Ecology

How did you first get involved working on oil and gas issues/fracking?

I had experienced the environmental and socioeconomic costs of fossil fuel extraction while I was a graduate student at Virginia Tech researching strip-mine/mountain top removal reclamation best practices as part of the Jim Burger’s Powell River Project. However, it wasn’t until I moved to Ohio in 2011 that I began to become aware of similar issues associated with high-volume hydraulic fracturing (HVHF). I began to notice that there are many parallels between the techniques and how they alter communities, the landscape, and watersheds. Thus, when I found out about the chance to join the FracTracker team here in Ohio I saw that it was an opportunity I could not pass up.

What is one of the most impactful projects that you have been involved in with FracTracker?

The projects I am most proud in my capacity here at FracTracker would be our research into the effects of HVHF freshwater demand on the resilience/security of the Muskingum River Watershed in eastern Ohio and our work shedding light on the effects of frac sand mining across several Midwestern states. The latter topic is poorly understood on many levels, and we hope that our work has/will highlight the gaps in understanding and potential research opportunities.

Read Ted Auch’s Articles

Ted Auch and team during a trip to NW Michigan's Ludington State Park to photograph and learn more about Sargent Sand's mine

Ted Auch and team during a trip to NW Michigan’s Ludington State Park to photograph and learn more about Sargent Sand’s mine

Clearing land for shale gas pipeline in PA

A Push For Pipelines

By Bill Hughes, WV Community Liaison

For anyone who even casually follows Marcellus and Utica shale gas exploration and production, such as in the active gas fields of West Virginia or Southwestern PA or Ohio, we know there are many concerns surrounding the natural gas production process. These issues range from air pollution, water consumption and contamination, to waste disposal. We know that, after all well the pad drilling and construction traffic are done, we must also have pipelines to get the gas to compressor stations, processing plants, and to markets in the Eastern United States (and likely Europe and Asia in the near future). Gas companies in Wetzel County, WV, and in neighboring tri-state counties, are convinced that building pipelines – really big pipelines – will be the silver bullet to achieving some semblance of stability and profitability.

Problems With Proposed Pipelines

One of the new, very large diameter (42”) proposed gas pipelines getting attention in the press is the Mountain Valley Pipeline, which will originate in the village of Mobley in eastern Wetzel County, WV and extend Southeast, through national forests and over the Appalachian Mountains into the state of Virginia. Even if the residents of Wetzel County and other natural gas fields are guinea pigs for experiments with hydraulic fracturing, we know how to build pipelines, don’t we? The equipment, knowledge, and skill sets needed for pipeline construction is readily available and commonly understood compared to high pressure horizontal drilling with large volumes of slick water. So, what could go wrong?

I can answer that question first hand from my hayfield in Wetzel County. Almost two years ago, EQT wanted to survey my property for a similar proposed pipeline – this one 30” in diameter, called the Ohio Valley Connector (OVC). The application for this project has now been filed with the Federal Energy Regulatory Commission (FERC). The below map shows a section of the OVC as proposed almost two years ago. The red outlined area is my property. The yellow line shows one proposed pathway of the 30” pipeline that would cross our land. Multiple routes were being explored at first. Were this version approved, it would have gone right through my hayfield and under our stream.

A section of the OVC as proposed almost two years ago.

A section of the OVC as proposed almost two years ago. The red outlined area is my property. The yellow line shows one proposed pathway of the 30” pipeline that would cross our land.

Pipeline opponents express concern about habitat fragmentation, the crossing of pristine streams and rivers, erosion and sedimentation issues, spills, gas leaks, and possible explosions. These are all very valid concerns. But the potential for other logistical errors in the building process – from very simple to potentially serious ones – are also worth consideration. In this article I will use my recent personal experience as a detailed and documented example of how a professionally surveyed location on my property contained an error of almost one mile – over 4,000 feet – as part of a pipeline construction planning project. Yes, you read that right.

Part I: How Did We Get To This Point

Before we get to my story, I should review my first contact with EQT on this issue. In February of 2014, an EQT land agent asked me for permission to walk my property for preliminary evaluation of a route that would send their 30” high-pressure pipe through our land, from south to north.

It is important to keep in mind that almost every landowner in Wetzel County has been contacted by mail, phone or in person, by land agents promising cash with a verbal assurance that all will be well. The goal is to get a landowner’s signature on a loosely worded “right of way” (RoW) lease contract, with terms favorable to the gas company, and move on. Unfortunately, pipeline lease offers cannot be ignored. Not objecting or not questioning can sometime leave the landowner with fewer choices later. This is because many of the bigger interstate transmission lines are being proposed as FERC lines. When final approval is granted by FERC, these pipelines will have the legal power of eminent domain, where the property owner is forced to comply. Just filing a FERC application does not grant eminent domain in West Virginia, as it seems to in Virginia, but the potential for eminent domain gives land agents power over landowners.

I was not ready to give them surveying permission (to drive stakes or other permanent markers). Since a natural gas pipeline would affect all my neighbors, however, I agreed to allow a preliminary walk through my property and to hang surveyor ribbons in exchange for answering my questions about the project. For instance, one of my biggest concerns was the potential for significant habitat fragmentation, splitting up the forest and endangering wildlife habitat.

There are many questions residents should consider when approached by land agent. A list of these questions can be found in the appendix below.

I never did get answers to most of my questions in the few e-mail exchanges and phone conversations with EQT. I never saw the surveyors either. They simply came and left their telltale colored ribbons. Later, at a public meeting an EQT representative said the closest they would run the pipe to any residence would be 37.5 feet. That number is correct. I asked twice. They said they had the right to run a pipeline that close to a residence but would do their best not to. The 37.5 feet is just one half of the permanent RoW of 75 feet, which was also only part of a 125 foot RoW requested for construction. A few months later, a very short e-mail said that the final pipeline route had changed and they would not be on my property. For a time we would enjoy some peace and quiet.

A Word On Surveyors

Most folks can relate to the work and responsibility of bookkeepers or Certified Public Accountants (CPAs). They measure and keep track of money. And their balance sheets and ledgers actually have to, well, BALANCE. Think of Surveyors as the CPAs of the land world. When they go up a big hill and down the other side, the keep track of every inch — they will not tolerate losing a few inches here and there. They truly are professionals, measuring and documenting everything with precision. Most of the surveyors I have spoken with are courteous and respectful. They are a credit to their profession. They are aware of the eminent domain threat and their surveying success depends on treating landowners with respect. They are good at what they do. However, as this article will show, their professional success and precision depends on whether or not they are given the correct route to survey.

Part II: Surveyor Stakes and Flags

Over the next year we enjoyed peace and quiet with no more surveyors’ intrusions. However, in my regular travels throughout the natural gas fields here, countless signs of surveyor activity were visible. Even with the temporary slowdown in drilling, the proposed pipeline installations kept these surveyors busy. Assorted types of stakes and ribbons and markings are impossible to miss along our roads. I usually notice many of the newer surveyor’s flags and the normal wooden stakes used to mark out future well pads, access roads, compressor stations, and more recently pipelines. Given that survey markings are never taken down when no longer needed, the old ones sometimes hide the new ones.

It can be difficult keeping track of all of them and hard at first to identify why they are there. Even if sometimes I am not sure what a stake and flag might indicate, when one shows up very unexpectedly in what is essentially my front yard, it is impossible to not see it. That is what happened in August of 2015. Despite being unable to get our hay cut due to excessive rain the previous month, the colored flags were highly visible. Below shows one of the stakes with surveyor’s tape, and the hay driven down where the surveyors had parked their trucks in my field alongside my access road.

A surveyor stake alongside my access road.

A surveyor stake alongside my access road.

To call it trespassing might not be legally defensible yet. The stakes were, after all, near a public roadway – but the pins and stakes and flags were on my property. Incidents like this, whether intentional or accidental, are what have given the natural gas companies a reputation as bad neighbors. There were surveyors’ stakes and flags at two different locations, my hay was driven down, and I had no idea what all this meant given that I had no communication from anyone at EQT in over 18 months. I consider myself fortunate that the surveyors did not stray into wooded areas where trees might have been cut. It’s been known to happen.

Below shows the two sets of wooden stakes, roughly 70-80 feet apart, with flags and capped steel rebar pins. Both stakes were near the road’s gravel lane, which is a public right of way. Nevertheless, the stakes were clearly on my property. The markings on one side of the stake identify the latitude, longitude, and the elevation above sea level of the point. The other side of the stake identified it as locating the OVC pipeline (seen here as “OVC 6C):

These identifying numbers are unique to this pin which is used to denote a specific type of location called a “control point.” Control points are usually located off to the side of the center-line of the pipeline:

A control point, located off to the side of the center-line of the pipeline.

A control point, located off to the side of the center-line of the pipeline.

It seemed that somehow, without informing me or asking permission to be on my land, EQT had changed their mind on the OVC route and were again planning to run a pipeline through my property. If this was intentional, both EQT and I had a problem. If this was some kind of mistake, then only EQT would have a problem. Either way I could not fathom how this happened. Trespassing, real or perceived, is always a sensitive topic. This is especially true since, when I had initially allowed the surveyor to be on my property, I had not given permission for surveying. Given concerns about eminent domain, I wanted answers quickly. I documented all this with detailed pictures in preparation for contacting EQT representatives in Pittsburgh, PA, with my complaints.

Part III: What Happened & How?

I think it is safe to say that, in light of my well-known activism in documenting all things Marcellus, I am not your average surface owner. I have over 10,000 photographs of Marcellus operations in Wetzel County and I document every aspect of it. Frequently this leads to contacting many state agencies and gas operators directly about problems. I knew which gas company was responsible and I also knew exactly who in Pittsburgh to contact. To their credit, the person I contacted at EQT, immediately responded and it took most of the day to track down what had happen. The short story was that it was all a simple mistake—a 4,300 foot long mistake—but still just a mistake. The long story follows.

The EQT representative assured me that someone would be out to remove their stakes, flags and the steel pins. I told them that they needed to be prompt and that I would not alter or move their property and locating points. The next day, when I got home, the stakes with flags were gone. Just a small bare patch of dirt remained near the white plastic fencepost I had placed to mark the location. However, since I am a cultivated skeptic—adhering to the old Russian proverb made famous by President Reagan, “Trust but Verify”—I grabbed a garden trowel, dug around a bit, and clink, clink. The steel pin had just been driven deeper to look good, just waiting for my tiller to locate someday. I profusely re-painted the pin, photographed it, and proceeded to send another somewhat harsh e-mail to EQT. The pin was removed the next day.

After all the stakes, ribbons, and steel pins were removed, EQT provided further insights into what had transpired. Multiple pipeline routes were being evaluated by EQT in the area. Gas companies always consider a wide range of constraints to pipeline construction such as road and stream crossings, available access roads, permission and cooperation of the many landowners, steepness of terrain, etc. At a certain point in their evaluation, a final route was chosen. But for unknown reasons the surveyor crew was given the old, now abanoned, route on which to establish their control points. The magnitiude of the error can be seen on the map below. The bright blue line is the original path of the OVC pipeline through my property and the red line shows where the FERC filed pipeline route will go. A new control point has now been established near the highway where the pipeline was meant to cross.

The FERC filed OVC pipeline route vs. the accidentally surveyed route.

The FERC filed OVC pipeline route vs. the accidentally surveyed route.

 

Part IV: Lessons To Be Learned

Given the likely impact of many proposed large-diameter, very long, pipelines being planned, it seems useful to examine how these errors can happen. What can we learn from my personal experience with the hundreds of miles of new pipelines constructed in Wetzel County over the past eight years? First, it is important to ask whether or not similar problems are likely to happen elsewhere, or if this was this just an isolated incident. Can we realistically expect better planning on the proposed Mountain Valley Pipeline, which will run for over 300 miles? Can the residents and landowners living along these pipeline RoWs expect more responsible construction and management practices?

In general, many of the pipeline projects with which landowners, such as those in Wetzel County, are familiar with fall into the unregulated, gathering line category. They might be anywhere from six inches in diameter up to sixteen inches. As we review their track record, we have seen every imaginable problem, both during construction and after they were put into operation. We have had gas leaks and condensate spills, hillside mud slips, broken pipes, erosion and sedimentation both during construction and afterwards.

Now for some apparently contradictory assumptions—I am convinced that, for the most part, truck drivers, pipeliners, equipment operators, drilling and fracturing crews, well tenders and service personnel at well sites, all do the best job they can. If they are given the proper tools and materials, accurate directions with trained and experienced supervision, the support resources and the time to do a good job, then they will complete their tasks consistently and proudly. A majority of employees in these positions are dedicated, trained, competent, and hard working. Of course, there are no perfect contractors out there. These guys are human too. And on the midnight shift, we all get tired. In the context of this story, some pipeline contractors are better and more professional than others, some are more experienced, and some have done the larger pipelines. Therefore, despite best intentions, significant errors and accidents will still occur.

The Inherent Contradictions

It seems to me that the fragile link in natural gas production and pipeline projects is simply the weakness of any large organization’s inherent business model. Every organization needs to constantly focus on what I refer to as the “four C’s—Command and Control, then Coordination and Communication—if they are to be at all successful. It is a challenge to manage these on a daily basis even when everyone is in the same big building, working for the same company, speaking the same language. This might be in a university, or a large medical complex, or an industrial manufacturing plant.

But the four C’s are nearly impossible to manage due to the simple fact that the organizational structure of the natural gas industry depends completely on hundreds of sub-contractors. And those companies, in turn, depend on a sprawling and transient, expanding and collapsing, network of hundreds of other diverse and divergent independent contractors. For example, on any given well pad, during the drilling or fracturing process, there might be a few “company” men on site. Those few guys actually work for the gas company in whose name the operating permit is drawn. Everyone else is working for another company, on site temporarily until they are ready to move on, and their loyalty is elsewhere.

In the best of situations, it is next to impossible to get the right piece of information to the right person at just the right time. Effective coordination among company men and contractors is also next to impossible. I have seen this, and listened in, when the drilling company is using one CB radio channel and the nearby pipeline company is using some private business band radio to talk to “their people.” In that case, the pipeline contractors could not talk to the well pad—and it did not matter to them. In other cases, the pilot vehicle drivers will unilaterally decide to use another CB radio channel and not tell everyone. I have also watched while a massive drill rig relocation was significantly delayed simply because a nearby new gas processing plant was simultaneously running at least a hundred dump trucks with gravel on the same narrow roadway. Constant communication is a basic requirement for traffic coordination, but next to impossible to do properly and consistently when these practices are so prevalent.

These examples illustrate how companies are often unable to coordinate their operations. Now, if you can, just try to picture this abysmal lack of command and control, and minimal communication and coordination, in the context of building a 300-mile length of pipeline. The larger the pipeline diameter, and the greater the overall length of the pipeline, the more contractors will be needed. With more contractors and sub-contractors, the more coordination and communication are essential. A FERC permit cannot fix this, nor would having a dozen FERC permits. Unfortunately, I do not envision the four Cs improving anytime soon in the natural gas industry. It seems to be the nature of the beast. If, as I know from personal experience, a major gas company can arrange to locate a surveyed control point 4,300 feet from where it should have been, then good luck with a 300 mile pipeline. Even with well-intentioned, trained employees, massive problems are still sure to come.

The FERC approvals for these pipelines might not be a done deal, but I would not bet against them. So vigilance and preparation will still be of the essence. Citizen groups must be prepared to observe, monitor, and document these projects as they unfold. If massive pipelines like the MVP and OVC are ever built, they should become the most photographed, measured, scrutinized, and documented public works projects since the aqueducts first delivered water to ancient Rome. For the sake of protecting the people and environment of Wetzel County and similar communities, I hope this is the case.

By Bill Hughes, WV Community Liaison, FracTracker Alliance
Read more Field Diary articles.

Appendix: Questions to Ask When Approached by a Land Agent (Landsman)

These questions can be modified to suit your location. The abbreviation “Gas Corp.” is used below to reference a typical natural gas company or a pipeline subsidiary to a natural gas company.  These subsidiaries are frequently called Midstream Companies. Midstream companies build and manage the pipelines, gas processing, and some compressor stations on behalf of natural gas companies.

  1. Please provide a Plain English translation of your landowner initial contract.
  2. What will Gas Corp. be allowed to do, and not allowed to do, short term and long term?
  3. What will Gas Corp. be required to do, and not required to do?
  4. What is the absolute minimum distance this pipeline will be placed away from any dwelling anywhere along its entire length?
  5. What restrictions will there be on the my land after you put in the pipelines?
  6. Who will be overseeing and enforcing any environmental restrictions (erosion and sedimentation, slips, stream crossings, etc.)?
  7.  Who will be responsible for my access road upkeep?
  8. Who will be responsible for long term slips and settlements of surface?
  9. When would this construction begin?
  10. When would all work be completed?
  11. Who would be responsible for long term stability of my land?
  12. Will the pipeline contractor(s) be bound to any of our agreements?
  13. Who are the pipeline contractor(s)?
  14. What will be transported in the pipeline?
  15. Will there be more than one pipe buried?
  16. How wide is the temporary work RoW?
  17. How wide is the permanent RoW?
  18. How deep will the pipeline(s) be buried?
  19. What size pipe will it be; what wall  thickness?
  20. How often will the welds on the individual pipe segments be inspected?
  21. Will there be any above ground pipeline components left visible?
  22. Where will the pipe(s) originate and where will they be going to?
  23. What will the average operating pressure be?
  24. What will the absolute maximum pressure ever be?
  25. At this pressure and diameter, what is the PIR—Potential Impact Radius?
  26. Will all pipeline and excavating and laying equipment be brought in clean and totally free from any invasive species?
  27. How will the disturbed soil be reclaimed?
  28. Will all top soil be kept separate and replaced after pipeline is buried?
  29. Also, After all the above is settled, how much will I be paid per linear foot of pipeline?

Surveyor Symbols & Signs – A Guide

The following guide is a simplified description of a variety of markings that are used by land surveyors. Throughout an active shale gas field, the first signs of pending expansions are the simple markings of stakes, flags, and pins. Many months or even years before the chain saw fells the first tree or the first dozer blade cuts the dirt at a well pad location, the surveyors have “marked the target” on behalf of their corporate tactical command staff.

The three most commonly used markings are the simple stakes, flags and pins. These surveyor symbols are common to any construction project and guarantee that everything gets put in the right place. In an active gas field, these marking tools are used for all aspects of exploration and production:

  • access roads to well pads,
  • widening the traveled portion of the roadway,
  • well locations,
  • ponds and impoundment locations,
  • temporary water pipeline paths,
  • surface disturbance limits,
  • compressor stations,
  • gas processing sites, and
  • rights-of-way for roads and pipelines.

Quite frequently these simple markings are undecipherable by themselves, especially by non-professionals. One cannot just know what is happening, what is likely to occur, or how concerned one should be. Context and additional information are usually needed. Sometimes the simple colors and combinations of colored tapes might only make sense in conjunction with similar markings nearby. Sometimes public notices in the newspaper and regulatory permits must be used to decipher what is planned.

For an example, the proposed 30″ diameter EQT pipeline called the Ohio Valley Connector seems to be regularly marked using a combination of blue and white (see figure 10 below) surveyors tape to mark the actual pipeline location, then green and white (see figure 4 below) to mark all the proposed access roads along the routes that will be used to get pipe trucks and excavation equipment into the right of way. These access roads might be public roadways or cut across private leased property.

Common surveyor symbols & signs (click on images to zoom in)

Surveyor flags and tape: Sometime the flags or streamers are just attached to trees, fence posts, or put on a stake to make them visible above the weeds. There might be no markings on the stake, or only simple generic markings. This could just mean that this is the correct road and turn here. It could also signal a proposed or approximate location for some future work.

Simple surveyor’s flags or tape

Simple surveyor’s flags or tape

Surveyor flags and tapes: These are a selection of typical surveyor tapes, also called flags or ribbons. Many other specialty color combinations are available to the professional surveyor.

A selection of surveyor tapes

Stakes with simple markings: Flags with some type of identification (it might be names or numbers). This one was used for a proposed well pad access road location. There are no dimensions given on these.

Stake with simple markings

Stakes with simple flags and basic identification: The stakes shown here all indicate an access route to be used for equipment and trucks to get to a proposed pipeline right of way. The “H310″ is the EQT name for the 30” OVC pipeline.

Stakes indicating an access route

Control points: These three stakes are identifying a control point that is outside the limits of disturbance (LoD). These markings surround a pin to be used for reference.

Control point stakes

Controls points: This stake is also identifying a control point location. All control points will have some type of driven metal rod, usually with a plastic cap identifying the surveyor. Frequently there are three stakes with extra flags or tape. They are always set off to the side of the intended work area. They are not to be disturbed.

Control point stake and pin

Control points: Another set of three stakes marking a Control Point location. It is common to see triple stakes with elaborate, multiple flags. Even if only two stakes are present, there always will be a driven steel pin and identifying cap.

Control point stakes and pin

Control points: This shows a close-up of the identifying cap on a metal driven steel pin. Control point locations are not meant to be disturbed as they are for future and repeated reference. They might give the latitude and longitude on the stake plus the altitude above sea level.

Control point pin and cap

Control points: This is another, older control point location. This represents a typical arrangement where the stakes somewhat try to protect the metal pin from a bulldozer blade by warning its operator.

Control point pin protection

Limit of disturbance: The “L O D” here means the limits of disturbance. Beyond this point there should not be any trees cut or dirt moved. The stakes shown here indicates that this is the outside limit of where the contractor will be disturbing the original contour of the surface soil.

Limit of disturbance stakes

Limit of disturbance: The “L O D” means the limits of disturbance of the proposed pipeline right of way. Beyond this point there should not be any trees cut or dirt moved. This could also be used for the outside edge of well pads or access roads or pond locations.

Limit of disturbance ROW stakes

Pipelines: Stakes with flags and “center line” markings are usually for pipelines. Here you see the symbol for center line: a capital letter “C” imposed on the letter “L”.

Pipelines center line

Pipelines: Again you see the capital letter “C” super imposed on top of the letter “L” used frequently for pipe line center lines, but can also be used for proposed access roads.

Pipelines center line

Pipelines: As shown here, “C” and “L” center line flags can also be used for future well pad access roads.

Road access center line

Precise location markings: Stakes like this will usually have a steel pin also associated with it. This stake gives the latitude, longitude, and elevation of the site.

Precise location stake

Permanent property lines: You may also find markings, like this one inch steel rod with an alum cap, that denote permanent property lines and corners of property.

Permanent property rod

Permanent property lines: Another kind of permanent property line or corner marker is the “boundary survey monument.” This is likely an aluminum cap on top of a one inch diameter steel bar.

Boundary survey monument

Pilgrim Pipelines proposal & community actions

Controversial 178-mile-long parallel pipelines proposed for NY’s Hudson Valley/Northern NJ

By Karen Edelstein, Eastern Program Coordinator

Over the past seven years, there has been a very strong upswing in domestic oil production coming from Bakken Formation in North Dakota. Extraction rates increased over 700% between November 2007 and November 2015, to over 1.2 million barrels per day. With all this oil coming out of the North Dakota oil fields, the challenge is how to get that oil to port, and to refineries. For the large part, the method of choice has been to move the oil by rail. Annual shipments out of North Dakota have jumped from 9500 carloads in 2008 to close to a half million carloads by 2013.

Nearly 25% of oil leaving the Bakken Formation is destined for east coast refineries located in New Jersey, Philadelphia, and Delaware. Trains carrying the crude enter New York State along two routes. A southern route, passes through Minneapolis, Chicago, Cleveland, and Buffalo, and on to Albany. A northern route, which originates in the oil fields of southern Manitoba and Saskatchewan Provinces in Canada, passes through Toronto, Montreal, and then south to Albany.

Currently, once the oil reaches Albany, it is transported south through the Hudson Valley, either by barge or by train. Two “unit trains” per day, each carrying 3 million gallons in 125-tank car trains, are bound for Philadelphia-area refineries. In addition, a barge per day, carrying 4 million gallons, heads to New Jersey refineries. Environmental groups in New York’s Hudson Valley, including Hudson RiverKeeper, have registered alarm and opposition about the potential impacts and risks of the transport of this process poses to the safety of residents of the Hudson Valley, and to the health of the Hudson River. More background information is available in this Pilgrim Pipelines 101 webinar.

What are the Pilgrim Pipelines?

The proposed Pilgrim Pipelines are two parallel 18-24-inch pipelines that would run from the Port of Albany to Linden, NJ, alongside the New York State Thruway (I-87) for 170 miles just to the west of the Hudson River, with nearly 80% of the pipeline within the public right-of-way. The rest of the pipeline would traverse private property and some utility areas.

The pipeline running south from Albany would carry the light, explosive crude to refineries in NJ, Philadelphia, and Delaware. After the oil is refined, the North-bound pipeline would carry the oil back to Albany, moving 200,000 barrels (8.4 million gallons) of oil in each direction, every day. Touted by Pilgrim Pipeline Holdings, LLC as a central component in “stabilization of the East Coast oil infrastructure,” the project proposes to:

provide the Northeast region of the United States with a more stable supply of essential refined petroleum products… and… provide the region with a safer and more environmentally friendly method of transporting oil and petroleum products.

The Controversy

The Pilgrim company is lead by two individuals with deep ties to the energy industry. Both the company president, Errol B. Boyles, as well as vice-president, Roger L. Williams, were in the upper echelon management of Wichita, Kansas-based Koch Industries.

Proponents of the project claim that it includes environmental benefits, such as 20% lower greenhouse gas emissions than would be generated moving the same quantity of oil via barge, and even claim that the proposed Pilgrim Pipelines “will produce a net air quality benefit to the region.” Of course, this argument is predicated on the belief that the unbridled oil extraction from the Bakken Formation is both environmentally desirable, and nationally required.

Economic benefits described by the pipeline company include the faster rate the petroleum products can be pumped through existing terminals in New York, and also meet a hoped-for demand surge for petroleum products. Naturally, the company would also create some construction jobs (albeit somewhat temporary and for out-of-state firms), and increase fuel available to consumers at lower prices because of proposed transportation savings. However, the Albany Business Review indicated that the pipeline could actually create a net loss of jobs if the pipeline were to make the Port of Albany less active as a shipping location.

Project opponents cite both short- and long-term impacts of the project on human and environmental health, the local and regional economy, property values, nearly a dozen threatened and endangered wildlife species, water quality, ecology of the pristine Hudson Highlands Region, and contributions that the project invariably makes to accelerating climate change, both through local impacts, and as an infrastructure component supporting the extraction of crude from the East Coast all the way to the Bakken Fields of North Dakota. Groups also cite the high rate of “non-technical” pipeline failures, due to excavation damage, natural force damage, and incorrect operation.

Communities in Action

Close to 60 municipalities along the pipeline route have passed local resolutions and ordinances expressing their opposition to the pipeline. Residents assert that the local communities would bear most of the risks, and few, if any, of the benefits associated with the Pilgrim Pipeline. These communities, represented by over a million people in New York and New Jersey, are shown in the map below. Other groups – including the New Jersey State Assembly and Senate, numerous county boards in both New York and New Jersey, and several school districts – have also passed resolutions opposing the project.

Access links to the resolution documents for individual towns by clicking on the town location in the map below.


View full screen map | How to work with our maps

Decision Makers in Question

The New York State Thruway Authority was initially the sole lead agency on the State Environmental Quality Review (SEQR) of the project, a decision that was decried by impacted municipalities, environmental groups, and the Ramapough Lenape Nation. Dwain Perry, Ramapough Lenape chief, urged that the New York State Department of Environmental Conservation be the lead agency, instead, saying:

…DEC has a much more thorough outlook into different things that can happen….[and]..is looking out for everyone’s interest.

However, in a development announced in late December 2015, the New York State Department of Environmental Conservation revealed that they, along with the NYS Thruway Authority, would jointly lead the environmental review of the project. This decision has perplexed many groups involved in the debate, and environmental groups such as Scenic Hudson, Environmental Advocates of New York, Hudson Riverkeeper, and Coalition Against the Pilgrim Pipeline expressed their dismay over this choice, and urged that the SEQR review address whether the project will be consistent with NY Governor Cuomo’s aggressive goals to reduce carbon emissions that are driving climate disruption.

DEC’s own guidelines advise against creating co-lead agencies in projects particularly because there is no prescribed process for resolution of disputes between two such agencies. Nonetheless, a DEC spokesperson, Sean Mahar, tried to assure critics that because the two lead agencies have “unique and distinct expertise” few problems would arise.

We’ll post updates as the project’s SEQR process gets underway.

Resources

Pilgrim Pipelines 101 webinar, presented by Kate Hudson (Riverkeeper) and Jennifer Metzger (Rosendale Town Board)

Interview with Therese Vick – Sentinel Award Winner

Kirk Jalbert, FracTracker’s Manager of Community Based Research & Engagement, interviews Therese Vick, one of FracTracker’s 2015 Community Sentinels Award Winners.

Therese Vick is a highly-regarded community organizer with the Blue Ridge Environmental Defense League in North Carolina. A big part of her work is serving BREDL chapters in Stokes, Anson, Lee, and Chatham counties – all frontline communities threatened by shale gas extraction. In these communities, she offers organizing assistance, training programs, and strategic campaign planning for local groups. Watch-dogging state regulatory agencies is also a significant part of Therese’s work, about which she publishes extensively on in her blog, From Where I Sit: Reports From The North Carolina Mining and Energy Commission Meetings. Therese lives in Raleigh, NC, with her cats Savannah and Charity, and a very opinionated bunny named Stella.

Q: To start, can tell us a little bit about your background and what brought you to the world of environmental advocacy work?

Therese: Well, I actually started out in a small town in Eastern North Carolina, working at a pharmacy. This was back in the very early ‘90s and a proposal for the world’s second largest hazardous waste incinerator landed on our county about six miles from my home. And this is a county that had no hospital. We had a volunteer fire department, but we had no haz-mat, none of that kind of infrastructure. That’s how I got involved in grassroots environmental work. I was a volunteer for years. Then I came on staff with Blue Ridge Environmental Defense League (BREDL) and was supported by a local organization – the North Hampton Citizens Against Pollution -through a small grant. I left my job at the drug store after about 15 years and went to work on a bunch of different issues, not just the hazardous waste incinerator, which we eventually defeated. I worked with BREDL for about three and a half years, then went back to work with my husband in his business and raised my kids but stayed active with local community groups off and on. I came here to the Triangle to complete my education in psychology and human services. I called the executive director of BREDL to let them know I was living here in Raleigh; I knew that they came to Raleigh sometimes. They offered me a job, I graduated, and I came back to work for BREDL. So that’s kind of how I ended up where I am right now. I have been volunteering and working on grassroots environmental issues for over 20 years.

Q: Now that you are back with Blue Ridge Environmental Defense League, what sorts of projects have you been working on?

A: It can change from one day to the next, but my biggest areas of work are on fracking, of course, disposal of coal ash, and air quality in particular. I’m also working on pipelines. The Atlantic Coast Pipeline is proposed to go through North Carolina. My co-worker and I are working with communities opposing that. And we work on myriads of other issues. We are community organizers, but we not only doing the organizing, we do a lot of research and technical assistance and watchdog regulatory agencies and things like that as well. That is another big part of my job, is public records and investigations and things like that.

Q: You also do a lot to communicate your findings to the public by way of your blog, From Where I Sit. How do you think that work has made a difference in helping community to understanding the political landscape of gas development?

A: How that blog came about was, I was attending many, many meetings. I can’t even tell you how many, I would say 100 meetings of the Mining and Energy Commission and their various committees, which were very hard to sit through and very frustrating. I wrote this really sarcastic report to our executive director and it was kind of funny too. He said, you know what, you need to start writing a blog before you lose your mind. So that is where it started. It was fun, but also serious. It’s a good organizing tool. In the court of public opinion, it is a good tool for communities to use and to let the general public know that this is something good we are doing for the community, for our community. I mean, it’s something that has to be done because we are just not being protected like we should be. And I don’t see that changing any time soon.

Fighting for Government Transparency

Q: How has all of this work that you are involved in shaped your feelings on the importance of making information and data available to the public?

A: Back in the ‘90s there were these proponents of the incinerator who were very assertive about how we needed the incinerator and how it was going to help the state and all of this stuff. People just had never known them to be active politically so they knew something was going on – all the proponents said, “oh we have nothing to gain from this, nothing. We just think it’s a good idea and blah, blah, blah.” So when I went to the state to do a file search, the first one I had ever done, nervous as I could be, and I found three options from three of the biggest proponent land owners with the company – they were selling their land to the company for the hazardous waste incinerator. Nobody knew this. And I so I paid my 25 cents a page, copied them, and hurried back home from Raleigh to the little town I lived. Long story short, it was a really big story. It was a statewide story and I got some threats, some anonymous threats, and I had a lawyer that call me saying I had no right to those documents. I ended up hanging up on him. Anyway, that kind of got me hooked on the power of having information.

Q: Have you found a similar sense of importance in working with oil and gas related data? I know, for instance, you have done a lot of writing about Halliburton having deep political ties in your area.

A: Well the Halliburton one, Greenpeace did some reporting on that piece and it got national attention. Most of the Mining and Energy Commission stuff is pretty mundane, but this one commissioner was not careful. I requested specific information about if they had met with certain individuals—all the commissioners, it was a request to all the commissioners. I wanted calendar entries and all that stuff. It took them a little bit to get me the information. But then this one commissioner he had it all in a folder that was marked Halliburton. I was stunned. There was this guy, Bowen Health, and he was a registered lobbyist for Halliburton. And this Commissioner, George Howard, he was on the Mining and Energy Commission. He had this folder marked Halliburton. Now, compared to other places of the country we had a pretty strong chemical disclosure law. And Halliburton essentially nixed that. They got that backed up. But this commissioner, he had a calendar entry on December 5th, 2012, from 5:30-6:00pm, there with Bowen Health, the Halliburton lobbyist. All of the commissioners had just maintained, over and over and over again, “We haven’t had any contact with Halliburton.” That is what led me to request the records and there it was, just in black and white. And, I tell you what, it made some of them really mad at him.

Q: What would you say, at this point, is the biggest challenge moving forward with this work?

A: I think the current anti-regulatory frenzy at the state level, the lack of care and concern for public health and the environment at the state level, and the rush to exploit oil and gas in North Carolina at any cost. Those would be the three biggest challenges you have to battle every single day. You’ve got the same philosophy at the head of the environmental agency that you have in the governor’s mansion and in the legislature. People that don’t—at least say they don’t—believe in climate change. People that think that fracking is fine. People that think that offshore drilling is great. Conservative folks, and I’m not political, but that’s one thing that kind of astounded me at the beginning of this. Forced pooling is legal in North Carolina, and it has been since the ‘40s. The fact that people who consider themselves believers in personal and private property rights support, or don’t repeal, that law just was stunning to me. I’m seeing the same thing with imminent domain and the pipelines. So the fact that all this stuff can be ignored, and with the legislature, the governor, and the Department Environment and Natural Resources having that same philosophy, makes it difficult, but not impossible.

Q: So how do you overcome the challenges of anti-disclosure and anti-regulatory sentiments?

A: You have to continue to try to expose what is going on. And, actually, I have got a huge request that I have been going through on coal ash that has some of what I was just telling you about. You have to expose what is going on to educate the public. You have to develop strategic plans within the bigger organization and at the community level, because you just have to be prepared for whatever comes next. And working at the grassroots is the most important thing – folks working in local communities with their local governments, that is the most important thing.

Q: If there was one thing that you would communicate to people or groups that are getting off the ground to deal with similar problems in other parts of the country, what would you say to those individuals?

A: We only have to last one day longer than they do. In other words, don’t give up. If you need to take a little break then take a break, but try to celebrate along the way because it’s hard work. It’s very, very hard work and it can be very depressing and stressful, especially when you are living in a targeted community or you are living with a problem. Try to have fun when you can find it.

Q: Is there anything else that you would like to mention that is important to you personally?

A: I just wanted to say – about the Community Sentinel Award – I wanted to lift up the communities that I work with. Over time they become friends, and they are the heroes. They are the heroes, and I couldn’t do the kind of work that I do without them.