Mariner East 2 Causes Dozens of Spills Since Lockdown Began, Over 300 in Total

FracTracker Alliance has released a new map of drilling fluid spills along the Mariner East 2 pipeline route, showing 320 spills from its construction since 2017. Of those, a combined 147 incidents have released over 260,000 gallons of drilling fluid into Pennsylvania waterways. 

The unpermitted discharge of drilling fluid, considered “industrial waste,” into waters of the Commonwealth violates The Clean Streams Law.

What you need to know:

  • Sunoco’s installation of the Mariner East 2 pipeline has triggered 320 incidences of drilling mud spills since 2017, releasing between 344,590 – 405,990 gallons of drilling fluid into the environment. View an interactive map and see a timeline of these incidents.
  • Construction has caused between 260,672 – 266,223 gallons of drilling fluid to spill into waterways, threatening the health of ecosystems and negatively affecting the drinking water of many residents.
  • There have been 36 spills since Pennsylvania entered a statewide shutdown on March 16th, 2020, in response to the COVID-19 pandemic. These spills released over 10,000 gallons of drilling fluid — most of which poured into Marsh Creek Lake in Marsh Creek State Park. See a map of this incident.

Pipeline Map

 

While the total reported volume of drilling fluid released into the environment from the pipeline’s construction is between 344,590 – 405,990 gallons, the actual total is larger, as there are 28 spills with unknown volumes. Spills of drilling mud are also referred to as “inadvertent returns,” or “frac-outs.” 

Most of these spills occurred during implementation of horizontal directional drills (HDD). HDDs are used to install a pipeline under a waterway, road, or other sensitive area. This technique requires large quantities of drilling fluid (comprising water, bentonite clay, and chemical additives), which when spilled into the environment, can damage ecosystems and contaminate drinking water sources. 

ME2 Background

The Mariner East 2 pipeline project is part of the Mariner East pipeline system, which carries natural gas liquids (NGLs) extracted by fracked wells in the Ohio River Valley east, to the Marcus Hook Facility in Delaware County, Pennsylvania. The NGLs will then go to Europe to be turned into plastic. Explore FracTracker’s other resources on this project:

Three dozen spills during COVID-19 pandemic

There have been 36 spills since the Commonwealth shutdown statewide on March 16th, 2020, leaks that have jeopardized drinking water sources, putting communities at even higher risk during the COVID-19 pandemic.

The most concerning occurred on August 10th, when pipeline construction released 8,163 gallons of drilling fluids into a wetland and stream system that drains into Marsh Creek Lake in Chester County, a drinking water reservoir (Figure 1). The Department of Environmental Protection (DEP), Pennsylvania Fish and Boat Commission, private contractors, and the Department of Conservation and Natural Resources are responding to the incident and conducting water tests.

On August 11th, construction caused a 15-foot wide and eight-foot deep subsidence event in the wetland (Figure 1). This caused drilling fluid to flow underground and contaminate groundwater, while also “adversely impacting the functions and values of the wetland.” Thirty-three acres of the lake are now closed to boating, fishing, and other uses of the lake — an extra blow, given the solace state parks have provided to many during this pandemic.

Map of Spills at Marsh Creek Lake

Figure 1. This HDD crossing in Upper Uwchlan Township, Chester County, caused over 8,000 gallons of drilling mud to spill into waterways. However, installation of the parallel 16-inch pipeline also caused spills at this same location in 2017.

A plume of drilling mud, captured here on video, entered the Marsh Creek Lake and settled on the lake bottom. 

Upper Uwchlan Reroute

Last week, the PA DEP ordered Sunoco to suspend work on this HDD site and to implement a reroute using a course Sunoco had identified as an alternative in 2017:

“A 1.01 mile reroute to the north of the HDD is technically feasible. This would entail adjusting the project route prior to this HDD’s northwest entry/exit point to proceed north, cross under the Pennsylvania Turnpike, then proceed east for 0.7 miles parallel to the turnpike, cross Little Conestoga Road, then turn south, cross under the turnpike, and then reintersect the existing project route just east of this HDD’s southeast entry/exit point. There is no existing utility corridor here, however; therefore, this route would create a Greenfield utility corridor and would result in encumbering previously unaffected properties. The route would still cross two Waters of the Commonwealth and possible forested wetlands, and would pass in near proximity or immediately adjacent to five residential home sites. Both crossings of the turnpike would require “mini” HDDs or direct pipe bores to achieve the required depth of cover under the highway. Considered against the possibility of additional IRs [inadvertent returns] occurring on the proposed HDD, which are readily contained and cleaned up with minimal affect to natural resources, the permanent taking of the new 4 easement and likely need to use condemnation against previously unaffected landowners results in SPLP’s opinion that managing the proposed HDD is the preferred option.”

Based on that description, the route could follow the general direction of the dashed line in Figure 2:

Map of pipeline

Figure 2. Possible reroute of Mariner East 2 Pipeline shown with dashed line

The DEP’s order also requires Sunoco to restore and remediate “impacted aquatic life, biota, and habitat, including the functions and values of the impacted wetlands resources, and all impacted recreational uses.” Sunoco must submit an Impact Assessment and Restoration Plan for this drill site by October 1, 2020, and the plan must provide for five years of monitoring after its completed restoration. In the meantime, Sunoco must secure the borehole using “grouting or equivalent method,” and continue to monitor the site. 

Sunoco’s continued negligence

The August incident likely surprised no one, as it was not the first spill at this location, and Sunoco’s own assessment acknowledged that this HDD crossing came with “a moderate to high risk of drilling fluid loss and IRs.”

Residents also sounded alarm bells for this drilling site. The proposal for just this location garnered over 200 public comments, all of which called on the DEP to deny Sunoco’s permit for drilling in this area. Many implored the DEP to consider the alternate route Sunoco must now use. 

George Alexander, a Delaware County resident who runs a blog on this pipeline, the Dragonpipe Diary, says, “Sunoco/Energy Transfer continues to demonstrate in real time that they cannot build the Mariner Pipelines without inflicting harm upon our communities … The Marsh Creek situation is reminiscent of the damage to another favorite Pennsylvania lake, Raystown Lake in Huntingdon County.”

In 2017, Sunoco spilled over 200,000 gallons of drilling fluid into Raystown Lake, and released millions more underground. The spill caked acres of the lakebed with a coating of mud, hurting aquatic life and limiting recreational access to the lake. Sunoco failed to report the spills when they occurred, and the DEP fined the company $1.95 million for the incident. The fine is one of many Sunoco has incurred, including a $12.6 million penalty in February 2018 for permit violations, and more recently, a $355,636 penalty for drilling fluid discharges into waterways across eight counties.

Bleak outlook for oil and gas pipelines

On top of the delays, fines, strong public opposition, and even House and Senate members calling for permits to be revoked,  there’s another factor working against Sunoco — the bleak financial outlook of the petrochemical industry.

The fracking boom triggered investment in projects to convert the fracked gas to plastic, leading to an oversupply in the global market. The industry made ambitious plans based on the price of plastic being $1/pound. Now, in 2020, the price is 40 – 60 cents per pound. If the Mariner East 2 pipeline is brought online, it likely will not be as profitable as its operators expected.

The poor finances of the oil and gas industry have led to the demise of several pipeline projects over the last few months. Phillips 66 announced in March it was deferring two pipelines — the Liberty Pipeline, which would transport crude oil from Wyoming to Oklahoma — and the Red Oak Pipeline system, planned to cross from Oklahoma to Texas. Kinder Morgan expressed uncertainty for its proposed Texas Permian Pass pipeline,  and Enterprise Products Partners cancelled its Midland-to-ECHO crude oil pipeline project. The Atlantic Coast Pipeline also was cancelled this past July by Duke Energy and Dominion Energy, following “an unacceptable layer of uncertainty and anticipated delays,” and the Williams Constitution pipeline was also abandoned after years of challenges. In fact, the EIA recently reported that more pipeline capacity has been cancelled in 2020 than new capacity brought in service.

Will the Mariner East 2 be the next to fall?

Before you go

A note from the Safety 7: The Safety 7 are seven residents of Delaware and Chester Counties who are challenging Sunoco before the [Pennsylvania Public Utility Commission]. If you are outraged at the ongoing threat to our communities from this dangerous, destructive pipeline, please consider donating to the Safety 7 Legal fund … Our next hearing begins September 29, and funds from your support are urgently needed. This motion is representative of the kind of legal work we need, if we are to prevail in protecting our communities from this dangerous pipeline project. Please contribute today if you are able, and please share this appeal widely and let your friends and family know why this case matters to you!

Learn more and donate here.

By Erica Jackson, Community Outreach and Communications Specialist, FracTracker Alliance

This map and analysis relied on data provided by the Pennsylvania Department of Environmental Protection.